Valley-to-valley integration
Baselining a small peak from valley to valley rather than to the true baseline. Assigns the overlap to the larger peak and understates the smaller one.
Related terms
- Drop-line integration
- Separating two overlapping peaks with a vertical line dropped from the valley between them. Unbiased when the peaks are of comparable size.
see also Valley-to-valley integration · Tangent skim
Where this term appears
The glossary exists to make record pages readable without a chemistry degree. Every technical term on a report resolves here.
- Assay report records — the term appears in result tables, peak tables and provenance blocks
- Method references — where the measurement behind the term is defined
- All 6 glossary terms beginning with V